DRY & WET PROCESS FOLLOW CHART- STANDARD OPERATION PROCEDURE (SOP)-
for denim washing
Sl. No.
|
Process Name
|
SOP
|
If okay
|
If Not okay-
but repairable
|
If Rejected
|
Remarks
|
||
1
|
Dry Process
|
Garments
counting and receiving form garments/ sewing factory.
|
||||||
2
|
Garments
placed on rack / shelf after opening each bundle tying.
|
|||||||
3
|
Shade and quality checking before dry
process starting.
|
|||||||
4
|
Discussion
and finding the critical problems before bulk production starting.
|
Risk analysis
for production of the garments
|
||||||
5
|
Thread sucking of the garments.
|
|||||||
6
|
Size grading of the garments.
|
|||||||
7
|
Marking
for manual whisker / Laser whisker
|
|||||||
8
|
QC
of Marking
|
If
okay- then proceed to Next process
|
If
not okay – reprocessed and prepared for Next process
|
|||||
9
|
Whisker Operation completion
|
|||||||
10
|
QC
of Whisker points (Standard Vs.
Production)
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing
|
If
not okay and Rejected- then send to reject box.
|
||||
11
|
Marking
for hand sanding area of the garments
|
|||||||
12
|
QC
of Marking
|
If
okay- then proceed to Next process
|
If
not okay – Reprocessed and prepared for Next process
|
|||||
13
|
Manual Hand Sanding / Laser burn hand
sanding
|
|||||||
14
|
QC
checking of Hand sanding points
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing.
|
If
not okay and Rejected- then send to reject box.
|
||||
15
|
Marking
for Back part hand sanding of garments
|
|||||||
16
|
QC
of Marking
|
If
okay- then proceed to Next process
|
If
not okay – Reprocessed and prepared for Next process
|
|||||
17
|
Back touch competition
|
|||||||
18
|
QC
Back part – points
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing.
|
If
not okay and Rejected- then send to reject box.
|
||||
19
|
Tagging / Tying / Bag- Netting /
Scraping
|
If
required as per standard.
|
||||||
20
|
Wet Process-
Enzyme Wash
|
Unwashed
garments shade segregation in the wash floor before Batch making.
|
||||||
21
|
Batch Making for 1st wash:Batch making
by shade wise garments weighing (Balance used).
|
|||||||
22
|
Waist
belt tying (if necessary).
|
|||||||
23
|
Complete
batch garments loading into clean wash machine.
|
|||||||
24
|
De-Sizing
Step
|
First Wash
steps
|
||||||
25
|
Enzyme
Step
|
|||||||
26
|
Cleaning
Step
|
|||||||
27
|
Bleaching
Step (if necessary)
|
|||||||
28
|
Neutralization
Step if garments are bleached using Calcium hypo chlorate.
|
|||||||
29
|
Hydro
water extraction from wet garments
|
|||||||
30
|
Dryer:wetgarments drying
|
|||||||
31
|
Dry Process
|
Dry
garments after first wash taken to PP Spray room for PP spray- and Shades are
segregated before P.P spray.
|
||||||
32
|
Destroy
design – if remains in the standard. (Manually/ using Laser)
|
|||||||
33
|
Marking
of the destroy points
|
|||||||
34
|
QC
of Marking points
|
If
okay- then proceed to Next process
|
If
not okay – Reprocessed and prepared for Next process
|
|||||
35
|
Destroy
design made using – Manual method/ Laser Burning
|
|||||||
36
|
QC
of Destroy design-
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing.
|
If
not okay and Rejected- then send to reject box.
|
||||
37
|
Grinding
– if remains in the standard. (Using Rolling grinder machine)
|
|||||||
38
|
QC
of Grinding process-
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing.
|
If
not okay and Rejected- then send to reject box.
|
||||
39
|
·
Marking for PP spray of garments
|
|||||||
40
|
QC
of Marking
|
If
okay- then proceed to Next process
|
If
not okay – Reprocessed and prepared for Next process
|
|||||
41
|
Potassium Per Manganite (PP) spray
using set recipe
|
|||||||
42
|
QC
of PP spray of the garments
|
If
okay- then proceed to Next process
|
If
– P.P is less then re-sprayed to achieve the looking using chalk mark QC
direction.
|
If
– P.P is more & rejected- then send to Reject box.
|
||||
43
|
Wet Process- Neutral
Wash
|
Again
brining the garments to the wash floor after PP spray competition for Neutral
Wash.
|
Second Wash
steps
|
|||||
44
|
Batch
Making for 2nd wash: Garments loading into clean wash machine
after shade segregation.
|
|||||||
45
|
Towel
Abrasion Bleaching if remains in the standard.
|
|||||||
46
|
Second
Time bleaching for achieving shade if necessary.
|
|||||||
47
|
P.P
and Bleaching Neutralization Step
|
|||||||
48
|
Cleaning
Step
|
|||||||
49
|
Drying
/ Tinting if required.
|
|||||||
50
|
Fixing
of dye stuff & washing shade.
|
|||||||
51
|
Softening
of garments + PH Controlling in the washing
bath in this step.
|
|||||||
52
|
Hydro
water extraction from wet garments
|
|||||||
53
|
Dryer: wet garments drying
|
|||||||
54
|
QC
|
Finishing QC checking after second
wash completion
|
If
shade okay- then Pack & Send to Sewing factory for further finishing/
trimming.
|
|||||
If
the shade is not okay
|
Send
for reprocessing
|
And
after reprocessing
|
If
shade okay then send to Finishing QC check (SL-46)
|
|||||
If
shade not okay then send to Reject Box.
|
||||||||
55
|
After Wash
complete
(Dry process
for styling)
|
Air blowing in the destroy placement
area to remove excess stitches which needs to be removed / to make frays. (if
required)
|
||||||
56
|
QC
of Destroy placement design/ looking
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing.
|
If
not okay and Rejected- then send to reject box.
|
||||
57
|
Glue Patch Placement inside of the
destroy placement area (if required)
|
|||||||
58
|
Heat
Setting to fix the glue patches in the destroy placement area.
|
|||||||
59
|
QC
of Destroy glue patch
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing.
|
If
not okay and Rejected- then send to reject box.
|
||||
60
|
For 3D/ Crimping design- Resin with
elastomeric softener is sprayed inside of the garments at the design
placement area.
|
|||||||
61
|
Iron 3D (Curved) / Box 3D (Round) is
build based on standard.
|
|||||||
62
|
QC
of 3D design/ looking
|
If
okay- then proceed to Next process
|
If not okay but repairable- then
proceed to Next process after repairing.
|
|||||
63
|
Curing in the Oven for fixing the
design permanently.
|
|||||||
64
|
Moisture checking of the garments
after cooling
|
If
moisture regain is less than RH%- 45% then garments are pack for delivery. Or
else for higher than 45% of RH% - garments are re-oven/ re-dryer to control
Moisture of the garments.
|
||||||
65
|
Delivery
|
Packing the
garments to send for final Trimming.
|
Written By,
K M Zahidur Rahman
Executive- R&D Section
Hameem Group.